Choose the correct construction for the job
A requirement naming Nomex or another approved fiber should be supported by the corresponding material identity. Similar appearance does not establish fiber equivalence.
| Ordering field | State with the RFQ |
|---|---|
| Fiber designation | Use the approved grade, drawing or equipment requirement. |
| impregnation | Use the approved grade, drawing or equipment requirement. |
| section | List the required value and quantity for each item. |
| ring or coil supply | List the required value and quantity for each item. |
| equipment conditions | List the required value and quantity for each item. |
Material, construction and ordering options
Identify the required construction on each order line. State the selected option with its material grade, profile or drawing specification.
| Material / construction option | Include in your purchasing description |
|---|---|
| Nomex Packing | Material or construction designation, dimensions, quantity and the relevant drawing or standard. |
Construction and ordering specification
| Specification | Details | Ordering note |
|---|---|---|
| Product construction | Meta-Aramid Packing | A requirement naming Nomex or another approved fiber should be supported by the corresponding material identity. Similar appearance does not establish fiber equivalence. |
| Ordering details | Fiber designation; impregnation; section | ring or coil supply; equipment conditions |
| Supply scope | Specified material, form and drawing-based requirements | Identify each item and quantity separately. |
| Manufacturing source | Kaxite-owned factory | Contact Cindy for the product-specific manufacturing and inspection review. |
Handling, installation and replacement
Preserve fiber and treatment identification through cutting and installation. Apply the equipment's commissioning and adjustment instructions.
Inspection and documents for the selected item
Agree material identification, section checks and any project-required test evidence before purchase.
Identify the drawing revision, acceptance criteria and the records that must accompany the order. If an independent inspection, witness point or special test is required, include its method and scope in the RFQ.
Discuss inspection documents ↗Custom supply, samples and purchasing details
Provide the shaft or stem diameter, stuffing-box bore and usable depth, then state fiber designation; impregnation; section; ring or coil supply; equipment conditions. Separate rotating, reciprocating and valve-stem duties in the inquiry.
Ask whether the quotation covers a continuous coil, cut lengths or a prepared ring set. MOQ, sample supply, documents and lead time should be confirmed for the specified fiber, treatment and dimensions.
Send drawings and quantities ↗Questions about meta-aramid packing
What should I specify when ordering meta-aramid packing?
Fiber designation; impregnation; section; ring or coil supply; equipment conditions. A requirement naming Nomex or another approved fiber should be supported by the corresponding material identity. Similar appearance does not establish fiber equivalence.
Which checks should be agreed before supply?
Agree material identification, section checks and any project-required test evidence before purchase.
Can I request samples, custom dimensions and a delivery quotation?
Send the required construction or drawing, each item quantity, inspection requirements, destination and requested date. The quotation confirms sample scope, minimum order, processing, documents and lead time for the selected item.
Prepare the order information
Keep the product designation, drawing revision, material, dimensions and item quantities together when requesting a quotation.
Open the relevant ordering checklist ↗Discuss meta-aramid packing with Cindy
Contact Kaxite in Ningbo, China with your specification, quantities and delivery requirements.
Request a quotation ↗



